PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installed waste piping at the 1st floor going into the 2nd floor Kitchen 213.jpg Installing sanitary-waster piping at the 1st floor going into the 2nd floor bathroom 208 Facing North.jpg Sanitary-waste piping going into the 2nd floor bathroom 234 Facing North.jpg Started laying out block at the detention cells Facing South-East.jpg Bathroom 220 roughing Facing North-West.jpg Bathroom 234 Roughing Facing West.jpg Continued installing ductwork at the 3rd floor Facing East.jpg Hot water supply - return piping at the 4th floor Facing West.jpg Installed metal clips along the top roof perimeter for the parapet Facing East.jpg
Previous pageNext page Bathroom 220 roughing Facing North-West
Bathroom 220 roughing Facing North-West